NuFarm DMA Project

DSC_0342

A long standing MDB Engineering customer was introducing a new product to their plant which required the creation of a new storage and tanker offloading area. MDB Engineering carried out the electrical and instrumentation installation for the project including all interface room and field wiring. The system allows the client to monitor product temperature, volume and movement, complete with a fully automated valve control system. The project also required a number of interface room improvements including installation of a new panel consisting of approximately 170 intrinsically safe barriers.